ISO 9001:2015  |  Since 1999 WhatsApp
Shuimu Induction 江西水木机电设备有限公司
Home / Products / Vacuum Separation Furnace

Copper-Zinc Separation by Vacuum Distillation

Separates zinc from copper-zinc brass scrap under vacuum. Copper stays in the crucible and is tapped clean; zinc is distilled off and recovered as metal, not as oxide dust.

真空分离炉 · Flagship

Overview

Separates zinc from copper-zinc brass scrap under vacuum. Copper stays in the crucible and is tapped clean; zinc is distilled off and recovered as metal, not as oxide dust.

Applications

  • Brass scrap & turnings
  • Copper-zinc dross
  • Galvanizing residues
  • Precious-metal bearing copper
Request a quotation
Vacuum Separation Furnace
Key points

Why it earns its place on your floor

Zinc leaves as metal, not as dust

Zinc is drawn off as vapour and condensed back into saleable metal, so you are not losing it into the baghouse.

Clean copper, tapped straight out

With the zinc removed, the copper stays inside the crucible and is tapped at a grade you can sell without discount.

One run instead of two

Vacuum separation replaces the separate melting and dressing steps, cutting both energy and labour per tonne.

Specification

Technical data

Values marked as approximate are typical for a standard build; final ratings are confirmed in the technical agreement for your order.

Need a different capacity, frequency or configuration? We build non-standard units.

Technical specification
Processing principleVacuum distillation — zinc evaporates and is condensed back into metal
Feed materialsBrass scrap, copper-zinc mixed material, zinc-bearing residues
Metal recoveryCopper retained in the crucible; zinc recovered; gold and silver recovered with the copper
ModelSMJD-3000T / SMJD-6000T
Typical capacitySMJD-3000T: 2+ tonnes per batch; SMJD-6000T: 4+ tonnes per batch
Cycle timeAluminium-zinc: approx. 3 hours per batch. Copper-zinc: approx. 3 batches per 24 hours (varies with material, typically ±1 hour)
OutputThroughput depends on the feed material and the charge weight — the final rating is agreed in the technical specification
Energy consumptionApprox. 700–900 kWh per tonne
Installed power300–500 kW, built to order
Power supplyIGBT digital induction power supply; approx. 15% less energy than the previous control cabinet
Transformer500 kVA
Working temperatureApprox. 1100 °C measured at the thermocouple
Furnace chamber temperatureUp to 1400 °C in the furnace chamber (thermocouple reads approx. 1100 °C)
Pump-down timeApprox. 5 hours to reach working vacuum
Vacuum level10–65 Pa (manufacturer catalogue figure; measurement point and method to be confirmed in the technical specification)
Furnace typeVertical or hydraulic tilting design, built to order
CrucibleGraphite-silicon carbide; 30–80 heats (depends on ramming practice); replacement approx. CNY 20,000 / approx. 2 days
CoolingOpen-circuit cooling tower: approx. 150 T for SMJD-3000T, approx. 180 T for SMJD-6000T
Separation resultCopper product: approx. 1% residual zinc. Zinc product: ≤1% residual copper
Gold & silverGold and silver report to the copper; overseas feed typically approx. 3 g Au and 500 g Ag per tonne
Export destinationsKorea, Thailand, Malaysia, Laos, Vietnam, Russia, Kazakhstan and more
Lead time35 working days (custom built)
Minimum order1 set
Trial runRMB 8,000 per run (chargeable)
CommissioningSite supervision by our engineers on request — chargeable service
Related equipment

Other machines we build

Core range Medium Frequency Induction Melting Furnace

Medium Frequency Induction Melting Furnace

Our core product line: all-solid-state digital induction melting furnaces from 1 kW to 3000 kW, for ferrous and non-ferrous metals …

View details
Heavy duty Electric Arc Furnace

Electric Arc Furnace

Integrated electric arc furnace sets for ore smelting, alloy separation and metal raw-material purification, supplied as a complete …

View details
Flexible fuel Gas Melting Furnace

Gas Melting Furnace

A gas-fired melting option for sites where electric power is limited or expensive, with low burn-out loss and a small footprint.

View details

Tell us what you are melting.

Send us your material, the zinc content and your monthly tonnage — we will come back with the right model and a transparent quotation.

Get a Quote
Talk to an engineer — we usually reply within one working day